![]() |
NOTICE TO NAVIGATION INTERESTS | ||||||||
| LITTLE ROCK DISTRICT | DATE: | 01/20/2026 | NOTICE NUMBER: 212899 | ||||||
| ATTN: CESWL-OP P.O. BOX 867 LITTLE ROCK AR 72203-0867 HTTP://WWW.SWL.USACE.ARMY.MIL/ |
POC: |
LOCAL NUMBER: SWL 26-02 WATERWAY: OZARK-JETTA TAYLOR, DARDANELLE, ARTHUR V ORMOND, TOAD SUCK FERRY, MURRAY, JAMES W TRIMBLE EFFECTIVE: 06/15/2026 07:00 thru 09/30/2026 19:00 CDT |
|||||||
| ________________________________________________________________________________________________________________________ | |||||||||
| 110-FT STOPLOG CONVERSION 2026 LOCK CLOSURE FORECAST MULTIPLE LOCATIONS MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM | |||||||||
The purpose of this Navigation Notice is to provide forecasted lock closures for the 110-ft Stoplog Conversion projects in 2026. The information below is considered tentative and the closure details could change depending on site conditions, construction means and methods and other variables.
Work related to the 110-ft Stoplog Conversions is forecasted to continue in 2026 at Dardanelle Lock (No. 10) NM 205.5 and at James W. Trimble Lock (No. 13) NM 292.8 and work will be begin at Murry Lock (No.7) NM 125.4, Toad Suck Ferry Lock (No. 8) NM 155.9, Arthur V. Ormond Lock (No. 9) NM 176.9, and Ozark Jetta-Taylor Lock (No. 12) NM 256.9. It is anticipated that the construction will take place beginning June 15th, 2026, through September 30th, 2026. During this time, the locks will be closed daily between the hours of 7:00 a.m. and 7:00 p.m. The locks will be opened to traffic each night between the hours of 7:00 p.m. and 7:00 a.m., however a 70-ft width restriction will be in place.
Questions or requests for additional information concerning this notice should be directed to the Little Rock District Office, at (501) 324-5096 or you may email CESWL-OP-OM@usace.army.mil.
|
|||||||||
| //unsigned// |