NOTICE TO NAVIGATION INTERESTS | ||||||||
| GALVESTON DISTRICT | DATE: | 12/02/2025 | NOTICE NUMBER: 212525 | ||||||
| ATTN: CESWG-DE 2000 FORT POINT ROAD - JADWIN GALVESTON TX 77550 HTTP://WWW.SWG.USACE.ARMY.MIL/ |
POC: |
LOCAL NUMBER: 212525_NTN-09_HSC_2025-12 WATERWAY: HOUSTON, HOUSTON SHIP CHANNEL, TX - MORGAN'S POINT TO BOGGY BAYOU EFFECTIVE: 12/15/2025 00:00 thru 05/17/2026 00:00 CST |
|||||||
| ________________________________________________________________________________________________________________________ | |||||||||
| Houston Ship Channel, Texas Morgans Point to Boggy Bayou, In Harris and Chambers Counties, Texas Maintenance Dredging | |||||||||
The Mechanical Dredge DB Catalina (contractor, Curtin Maritime (CMC) will be performing dredging activities commencing within the Houston Ship Channel starting at R "128" working westbound in the channel to Boggy Bayou. Dredging operations will commence on or about December 15, 2025, and concluding on or about May 17, 2026. The contractor will be operating 24 hours per day / 7 days per week (Monday through Sunday). Contractor’s related floating plant (barge, split hull Scows, and support tugs) are being used in/around this work area. All material will be transported in scows to Alexander Island and Lost Lake Placement Areas where an offloading barge will pump the material inside the placement areas.
|
|||||||||
| //unsigned// |